Triple

T18453793
Position Surface form Disambiguated ID Type / Status
Subject Kamuthi E450851 entity
Predicate hasNearbyFacility P5648 FINISHED
Object Kamuthi Solar Power Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kamuthi Solar Power Project | Statement: [Kamuthi, hasNearbyFacility, Kamuthi Solar Power Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kamuthi Solar Power Project
Context triple: [Kamuthi, hasNearbyFacility, Kamuthi Solar Power Project]
  • A. Port Qasim Coal Power Project
    The Port Qasim Coal Power Project is a major coal-fired power plant in Pakistan developed under the China–Pakistan Economic Corridor to help address the country’s electricity shortages.
  • B. Talwandi Sabo Power Project
    Talwandi Sabo Power Project is a major coal-based thermal power plant located in Punjab, India, that significantly contributes to the region’s electricity supply.
  • C. Jaisalmer wind farms
    Jaisalmer wind farms are a large cluster of wind energy installations in the Jaisalmer district of Rajasthan, India, known for harnessing the region’s strong desert winds to generate renewable power.
  • D. Rana Pratap Sagar Power Station
    Rana Pratap Sagar Power Station is a hydroelectric power facility in Rajasthan, India, that generates electricity using water from the Rana Pratap Sagar Dam on the Chambal River.
  • E. Renusagar Power Plant
    Renusagar Power Plant is a captive coal-based thermal power station in Uttar Pradesh, India, primarily dedicated to supplying electricity to Hindalco Industries’ aluminum operations.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kamuthi Solar Power Project
Target entity description: The Kamuthi Solar Power Project is a large-scale photovoltaic power plant in Tamil Nadu, India, known as one of the world’s largest single-location solar installations.
  • A. Port Qasim Coal Power Project
    The Port Qasim Coal Power Project is a major coal-fired power plant in Pakistan developed under the China–Pakistan Economic Corridor to help address the country’s electricity shortages.
  • B. Talwandi Sabo Power Project
    Talwandi Sabo Power Project is a major coal-based thermal power plant located in Punjab, India, that significantly contributes to the region’s electricity supply.
  • C. Jaisalmer wind farms
    Jaisalmer wind farms are a large cluster of wind energy installations in the Jaisalmer district of Rajasthan, India, known for harnessing the region’s strong desert winds to generate renewable power.
  • D. Rana Pratap Sagar Power Station
    Rana Pratap Sagar Power Station is a hydroelectric power facility in Rajasthan, India, that generates electricity using water from the Rana Pratap Sagar Dam on the Chambal River.
  • E. Renusagar Power Plant
    Renusagar Power Plant is a captive coal-based thermal power station in Uttar Pradesh, India, primarily dedicated to supplying electricity to Hindalco Industries’ aluminum operations.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38345688190b565eac2e4cd7935 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5264a49ec8190aa43381d93a55e91 completed April 19, 2026, 7 p.m.
Created at: April 10, 2026, 11:31 a.m.