Triple

T18448622
Position Surface form Disambiguated ID Type / Status
Subject Vientiane Province E450719 entity
Predicate hasHydropowerProject P15311 FINISHED
Object Nam Ngum 1 Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nam Ngum 1 Dam | Statement: [Vientiane Province, hasHydropowerProject, Nam Ngum 1 Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nam Ngum 1 Dam
Context triple: [Vientiane Province, hasHydropowerProject, Nam Ngum 1 Dam]
  • A. Nam Ngum 1 Dam chosen
    Nam Ngum 1 Dam is a major hydroelectric dam in Laos that forms the Nam Ngum Reservoir and plays a key role in the country’s power generation and regional electricity exports.
  • B. Nam Ngum 2 Dam
    Nam Ngum 2 Dam is a major hydroelectric power dam in Laos that generates electricity by harnessing the flow of the Nam Ngum River.
  • C. Nam Ngum 3 Dam
    Nam Ngum 3 Dam is a major hydroelectric power project in Laos built on the Nam Ngum River to generate electricity and support regional energy development.
  • D. Nam Ngum 5 Dam
    Nam Ngum 5 Dam is a hydroelectric power facility in Laos that harnesses the Nam Ngum River to generate electricity for the region.
  • E. Nam Ngum 4 Dam
    Nam Ngum 4 Dam is a hydroelectric power facility in Laos that forms part of the Nam Ngum River’s cascade of dams used for electricity generation and regional power supply.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38345688190b565eac2e4cd7935 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e52646949c81909664e864224675a6 completed April 19, 2026, 7 p.m.
Created at: April 10, 2026, 11:30 a.m.