Triple
T18448379
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Norwegian National Road 7 |
E450714
|
entity |
| Predicate | usesStructure |
P3097
|
FINISHED |
| Object | Hardanger Bridge |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hardanger Bridge | Statement: [Norwegian National Road 7, usesStructure, Hardanger Bridge]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hardanger Bridge Context triple: [Norwegian National Road 7, usesStructure, Hardanger Bridge]
-
A.
Hardanger Bridge
chosen
Hardanger Bridge is one of Norway’s longest suspension bridges, spanning the Hardangerfjord to connect the regions of Ulvik and Ullensvang.
-
B.
Sotra Bridge
Sotra Bridge is a major suspension bridge in western Norway that links the island of Sotra to the mainland near Bergen.
-
C.
Sandvika Bridge
Sandvika Bridge is a notable road bridge in the town of Sandvika, Norway, serving as an important local crossing and traffic connection.
-
D.
Lysaker Bridge
Lysaker Bridge is a key road and rail bridge in the Oslo area of Norway, carrying major traffic across the Lysaker River between Oslo and Bærum.
-
E.
Stord Bridge
Stord Bridge is a major suspension bridge in western Norway that connects the island of Stord to the mainland as part of an important regional transport route.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38345688190b565eac2e4cd7935 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e52646949c81909664e864224675a6 |
completed | April 19, 2026, 7 p.m. |
Created at: April 10, 2026, 11:30 a.m.