Triple

T1844837
Position Surface form Disambiguated ID Type / Status
Subject Virgin Orbit E41260 entity
Predicate IPOStatus P34099 FINISHED
Object publicly traded via SPAC merger LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: publicly traded via SPAC merger | Statement: [Virgin Orbit, IPOStatus, publicly traded via SPAC merger]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: IPOStatus
Context triple: [Virgin Orbit, IPOStatus, publicly traded via SPAC merger]
  • A. patentStatus
    Indicates the legal protection state of an invention or intellectual property, such as whether it is patented, pending, expired, or not filed.
  • B. appealStatus
    Indicates the current state or outcome of an appeal within a review or decision process.
  • C. acquisitionStatus
    Indicates the current state or outcome of an acquisition process between entities (e.g., pending, completed, failed, or canceled).
  • D. initiationStatus
    Indicates the current state or phase of beginning or starting a process, activity, or relationship between entities.
  • E. distributionStatus
    Indicates the current state or phase of how something is being distributed, such as whether distribution is planned, in progress, completed, or halted.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88648cd44819093303206d96d76ad completed March 4, 2026, 7:21 p.m.
NER Named-entity recognition batch_69abb32d35508190bf1c487dffbecaf0 completed March 7, 2026, 5:10 a.m.
PD Predicate disambiguation batch_69abafdb0d2c8190a67f584e67979fa3 completed March 7, 2026, 4:55 a.m.
PDg Predicate description generation batch_69abb32a8d548190a231c7c2ce276a5e completed March 7, 2026, 5:10 a.m.
Created at: March 4, 2026, 7:33 p.m.