Triple

T18447245
Position Surface form Disambiguated ID Type / Status
Subject Knowledge Park II E450687 entity
Predicate partOfCorridor P840 FINISHED
Object North–South corridor of Aqua Line NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North–South corridor of Aqua Line | Statement: [Knowledge Park II, partOfCorridor, North–South corridor of Aqua Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North–South corridor of Aqua Line
Context triple: [Knowledge Park II, partOfCorridor, North–South corridor of Aqua Line]
  • A. Aqua Line
    Aqua Line is one of the main corridors of the Nagpur Metro rapid transit system in Nagpur, India.
  • B. Aqua Line chosen
    Aqua Line is a rapid transit corridor of the Noida Metro system serving key areas of Noida and Greater Noida in the Delhi National Capital Region.
  • C. K Line corridor
    The K Line corridor is a Los Angeles Metro Rail light rail route serving neighborhoods in South Los Angeles, including areas such as Leimert Park.
  • D. Batong Line
    The Batong Line is a rapid transit line in Beijing that extends the Beijing Subway network eastward into the suburban Tongzhou District.
  • E. North–South and East–West Corridor
    The North–South and East–West Corridor is a major Indian highway development project that connects the country’s extremities through long-distance north–south and east–west routes to improve national connectivity and economic integration.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38345688190b565eac2e4cd7935 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e52645cb88819086b0e70b6613edcd completed April 19, 2026, 7 p.m.
Created at: April 10, 2026, 11:30 a.m.