Triple
T18447245
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Knowledge Park II |
E450687
|
entity |
| Predicate | partOfCorridor |
P840
|
FINISHED |
| Object | North–South corridor of Aqua Line |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North–South corridor of Aqua Line | Statement: [Knowledge Park II, partOfCorridor, North–South corridor of Aqua Line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: North–South corridor of Aqua Line Context triple: [Knowledge Park II, partOfCorridor, North–South corridor of Aqua Line]
-
A.
Aqua Line
Aqua Line is one of the main corridors of the Nagpur Metro rapid transit system in Nagpur, India.
-
B.
Aqua Line
chosen
Aqua Line is a rapid transit corridor of the Noida Metro system serving key areas of Noida and Greater Noida in the Delhi National Capital Region.
-
C.
K Line corridor
The K Line corridor is a Los Angeles Metro Rail light rail route serving neighborhoods in South Los Angeles, including areas such as Leimert Park.
-
D.
Batong Line
The Batong Line is a rapid transit line in Beijing that extends the Beijing Subway network eastward into the suburban Tongzhou District.
-
E.
North–South and East–West Corridor
The North–South and East–West Corridor is a major Indian highway development project that connects the country’s extremities through long-distance north–south and east–west routes to improve national connectivity and economic integration.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38345688190b565eac2e4cd7935 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e52645cb88819086b0e70b6613edcd |
completed | April 19, 2026, 7 p.m. |
Created at: April 10, 2026, 11:30 a.m.