Triple

T18447165
Position Surface form Disambiguated ID Type / Status
Subject Noida Sector 52–Noida Sector 51 (via walkway) E450685 entity
Predicate instanceOf P0 FINISHED
Object metro interchange facility C463 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metro interchange facility
Context triple: [Noida Sector 52–Noida Sector 51 (via walkway), instanceOf, metro interchange facility]
  • A. railway–metro interchange
    A railway–metro interchange is a transport facility where mainline railway services and urban metro lines connect, enabling passengers to transfer conveniently between regional and local rail networks.
  • B. group of metro interchange stations
    A group of metro interchange stations is a collection of transit hubs where multiple metro lines intersect, enabling passengers to transfer between routes within an urban rail network.
  • C. metro station entrance
    A metro station entrance is a designated access point at street level that allows passengers to enter or exit an underground or elevated metro system, typically featuring stairs, escalators, elevators, signage, and fare control access.
  • D. rapid transit station chosen
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • E. tram station
    A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38345688190b565eac2e4cd7935 completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:30 a.m.