Triple
T18411493
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 南方科技大学 |
E441768
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 理工科大学 |
C21593
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 理工科大学 Context triple: [南方科技大学, instanceOf, 理工科大学]
-
A.
全国重点大学
全国重点大学是指在中国高等教育体系中,由国家重点支持、在教学与科研方面具有重要地位和示范作用的高水平大学。
-
B.
engineering institute
An engineering institute is an educational and research organization dedicated to teaching, advancing, and applying engineering principles and technologies across various specialized fields.
-
C.
science and technology university
chosen
A science and technology university is a higher education institution focused on advancing knowledge and innovation in scientific, engineering, and technological fields through specialized teaching and research.
-
D.
college of Tsinghua University
A college of Tsinghua University is an academic unit within the university that organizes related disciplines, manages faculty and students, and oversees teaching, research, and degree programs in its specialized fields.
-
E.
college of engineering
A college of engineering is an academic division within a university that offers specialized education and research programs in various engineering disciplines, preparing students for professional engineering careers and technological innovation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9eb8a508190a942fd75ebd8b1dc |
completed | April 10, 2026, 8:50 a.m. |
Created at: April 10, 2026, 10:47 a.m.