Triple

T18409575
Position Surface form Disambiguated ID Type / Status
Subject 伊藤整一 E441719 entity
Predicate 役職 P3459 FINISHED
Object 軍令部次長 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 軍令部次長 | Statement: [伊藤整一, 役職, 軍令部次長]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 軍令部次長
Context triple: [伊藤整一, 役職, 軍令部次長]
  • A. 陸軍次官
    陸軍次官は、日本陸軍省において大臣を補佐し省務を統括した高級官僚ポストであり、軍政面で中枢的役割を担った役職である。
  • B. 軍令部 chosen
    軍令部 was the Imperial Japanese Navy’s high command body responsible for planning and directing naval operations before and during World War II.
  • C. 陸上幕僚長
    陸上幕僚長 is the highest-ranking officer and professional head of Japan’s Ground Self-Defense Force, responsible for overseeing its operations, organization, and readiness.
  • D. 軍需大臣
    軍需大臣は、戦時体制下で軍需産業や兵器生産・物資調達を統括し、国家総力戦を支える役割を担った日本の政府高官の職名である。
  • E. 北支那方面軍司令官
    北支那方面軍司令官は、日中戦争期に中国北部を担当した日本陸軍の方面軍を統轄し、作戦指導と占領統治を担った軍司令官職である。
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9eb8a508190a942fd75ebd8b1dc completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e5195b98808190b9cfb2e444f2b524 completed April 19, 2026, 6:05 p.m.
Created at: April 10, 2026, 10:47 a.m.