Triple
T18366662
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Glasgow North Electric scheme |
E440064
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway electrification project |
C17897
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway electrification project Context triple: [Glasgow North Electric scheme, instanceOf, railway electrification project]
-
A.
electrified railway
An electrified railway is a rail transport system in which trains receive power from external electrical sources, such as overhead lines or third rails, instead of relying on onboard fuel.
-
B.
railway modernisation project
chosen
A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
-
C.
third rail electrification system
A third rail electrification system is a method of providing electric power to trains via an additional rail mounted alongside or between the running rails, from which current is collected by contact shoes on the train.
-
D.
electrified railway operation
Electrified railway operation is the management and control of train services powered by electrical energy supplied through overhead lines or third rails, encompassing infrastructure, rolling stock, power systems, and operational procedures to ensure safe, efficient, and reliable transport.
-
E.
intercity passenger rail project
An intercity passenger rail project is a coordinated planning, design, and construction effort to develop or improve rail infrastructure and services that transport people efficiently between cities over medium to long distances.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b918221c8190a9f7b563d64ac677 |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:38 a.m.