Triple

T18366662
Position Surface form Disambiguated ID Type / Status
Subject Glasgow North Electric scheme E440064 entity
Predicate instanceOf P0 FINISHED
Object railway electrification project C17897 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway electrification project
Context triple: [Glasgow North Electric scheme, instanceOf, railway electrification project]
  • A. electrified railway
    An electrified railway is a rail transport system in which trains receive power from external electrical sources, such as overhead lines or third rails, instead of relying on onboard fuel.
  • B. railway modernisation project chosen
    A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
  • C. third rail electrification system
    A third rail electrification system is a method of providing electric power to trains via an additional rail mounted alongside or between the running rails, from which current is collected by contact shoes on the train.
  • D. electrified railway operation
    Electrified railway operation is the management and control of train services powered by electrical energy supplied through overhead lines or third rails, encompassing infrastructure, rolling stock, power systems, and operational procedures to ensure safe, efficient, and reliable transport.
  • E. intercity passenger rail project
    An intercity passenger rail project is a coordinated planning, design, and construction effort to develop or improve rail infrastructure and services that transport people efficiently between cities over medium to long distances.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b918221c8190a9f7b563d64ac677 completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:38 a.m.