Triple

T18344615
Position Surface form Disambiguated ID Type / Status
Subject Al Furjan Metro Station E439502 entity
Predicate partOf P40 FINISHED
Object Route 2020 project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Route 2020 project | Statement: [Al Furjan Metro Station, partOf, Route 2020 project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Route 2020 project
Context triple: [Al Furjan Metro Station, partOf, Route 2020 project]
  • A. Route 2020 chosen
    Route 2020 is an extension of the Dubai Metro built to connect the existing network to the Expo 2020 site and surrounding developing areas.
  • B. Route 2020 extension
    The Route 2020 extension is a major expansion of Dubai’s Metro network built to connect key urban areas with the Expo 2020 site and surrounding developments.
  • C. U.S. Route 202 highway project
    The U.S. Route 202 highway project is a major roadway improvement and realignment initiative in Pennsylvania that significantly reconfigured traffic patterns and local infrastructure along the U.S. 202 corridor.
  • D. Pipeline Road
    Pipeline Road is a renowned birdwatching and hiking trail in Panama that runs through the tropical forests of Soberanía National Park.
  • E. Pylons Project
    Pylons Project is an open-source organization that develops and maintains Python web frameworks and related tools, including the Pyramid framework.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9175fec8190af865699b4e64d8c completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e514f2c8ec8190b045482846a68204 completed April 19, 2026, 5:46 p.m.
Created at: April 10, 2026, 10:37 a.m.