Triple
T18326695
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Moss Airport, Rygge |
E439027
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former civil airport |
C6840
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former civil airport Context triple: [Moss Airport, Rygge, instanceOf, former civil airport]
-
A.
former airport
chosen
A former airport is a decommissioned airfield or aviation facility that has ceased regular flight operations and may be repurposed, abandoned, or preserved for historical or alternative uses.
-
B.
former air force base
A former air force base is a decommissioned military airfield and associated facilities that once supported air force operations but has since been closed, repurposed, or abandoned.
-
C.
airfield
An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
-
D.
former airport terminal concourse
A former airport terminal concourse is a decommissioned passenger circulation and gate area once used for boarding, disembarking, and connecting flights, now repurposed or left inactive.
-
E.
civil–military airport
A civil–military airport is an aerodrome jointly used by civilian air transport services and military aviation operations, sharing infrastructure, airspace, and support facilities under coordinated management.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b916a2d081909e249e4902f6aad9 |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:36 a.m.