Triple

T18326695
Position Surface form Disambiguated ID Type / Status
Subject Moss Airport, Rygge E439027 entity
Predicate instanceOf P0 FINISHED
Object former civil airport C6840 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former civil airport
Context triple: [Moss Airport, Rygge, instanceOf, former civil airport]
  • A. former airport chosen
    A former airport is a decommissioned airfield or aviation facility that has ceased regular flight operations and may be repurposed, abandoned, or preserved for historical or alternative uses.
  • B. former air force base
    A former air force base is a decommissioned military airfield and associated facilities that once supported air force operations but has since been closed, repurposed, or abandoned.
  • C. airfield
    An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
  • D. former airport terminal concourse
    A former airport terminal concourse is a decommissioned passenger circulation and gate area once used for boarding, disembarking, and connecting flights, now repurposed or left inactive.
  • E. civil–military airport
    A civil–military airport is an aerodrome jointly used by civilian air transport services and military aviation operations, sharing infrastructure, airspace, and support facilities under coordinated management.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b916a2d081909e249e4902f6aad9 completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:36 a.m.