Triple

T18309094
Position Surface form Disambiguated ID Type / Status
Subject R. L. Thornton Freeway E438570 entity
Predicate partOf P40 FINISHED
Object Interstate 30 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 30 | Statement: [R. L. Thornton Freeway, partOf, Interstate 30]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 30
Context triple: [R. L. Thornton Freeway, partOf, Interstate 30]
  • A. Interstate 30 chosen
    Interstate 30 is a major east–west U.S. highway running through Texas and Arkansas, connecting cities such as Dallas and Fort Worth to Little Rock.
  • B. Interstate 35
    Interstate 35 is a major north–south U.S. highway running from the Mexican border in Texas through the central United States to Minnesota, serving numerous key cities along its route.
  • C. Interstate 40
    Interstate 40 is a major east–west transcontinental highway in the United States that stretches from California to North Carolina, passing through several key cities and states.
  • D. Interstate 35E
    Interstate 35E is the eastern branch of Interstate 35 that runs through Dallas, Texas, serving as a key north–south transportation corridor in the region.
  • E. Interstate 35E
    Interstate 35E is a major north–south U.S. Interstate Highway that runs through Saint Paul, Minnesota, as part of the split of Interstate 35 in the Twin Cities metropolitan area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b915e3e881909125d760c15d0c29 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e5021709f88190a8047dd57edc2029 completed April 19, 2026, 4:25 p.m.
Created at: April 10, 2026, 10:36 a.m.