Triple

T18306984
Position Surface form Disambiguated ID Type / Status
Subject Hungry Horse Dam E438510 entity
Predicate providesServiceTo P82 FINISHED
Object Pacific Northwest power grid NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pacific Northwest power grid | Statement: [Hungry Horse Dam, providesServiceTo, Pacific Northwest power grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pacific Northwest power grid
Context triple: [Hungry Horse Dam, providesServiceTo, Pacific Northwest power grid]
  • A. Northwestern U.S. power grid chosen
    The Northwestern U.S. power grid is the interconnected regional electricity transmission network that distributes power across states in the Pacific Northwest, integrating utilities, generators, and consumers.
  • B. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • C. New England power grid
    The New England power grid is the interconnected high-voltage transmission network that delivers electricity across the six New England states, coordinating generation, transmission, and reliability for the region.
  • D. Southwest U.S. electrical grid
    The Southwest U.S. electrical grid is a major regional power network that transmits and distributes electricity across the southwestern United States, integrating generation resources and interconnections with neighboring grids.
  • E. California electrical grid
    The California electrical grid is the interconnected network of power plants, transmission lines, and distribution systems that delivers electricity across the state of California.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b915e3e881909125d760c15d0c29 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e5021519a481908a9b6561946f1c65 completed April 19, 2026, 4:25 p.m.
Created at: April 10, 2026, 10:35 a.m.