Triple

T18305994
Position Surface form Disambiguated ID Type / Status
Subject Marine Parkway–Gil Hodges Memorial Bridge E438484 entity
Predicate constructionStartDate P288 FINISHED
Object 1935 LITERAL FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1935 | Statement: [Marine Parkway–Gil Hodges Memorial Bridge, constructionStartDate, 1935]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b915e3e881909125d760c15d0c29 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e50183394081909b86cefaaa0a3aa8 completed April 19, 2026, 4:23 p.m.
Created at: April 10, 2026, 10:35 a.m.