Triple

T18304025
Position Surface form Disambiguated ID Type / Status
Subject Penobscot River watershed E438434 entity
Predicate includesTown P847 FINISHED
Object Orrington NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Orrington | Statement: [Penobscot River watershed, includesTown, Orrington]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Orrington
Context triple: [Penobscot River watershed, includesTown, Orrington]
  • A. Orrington, Maine chosen
    Orrington, Maine is a small town in Penobscot County known for its rural character and proximity to the Penobscot River and the city of Bangor.
  • B. Kingston, New Hampshire
    Kingston, New Hampshire is a small historic town in southeastern New Hampshire known for its colonial-era architecture and traditional New England character.
  • C. Rumney
    Rumney is a district in the eastern part of Cardiff, Wales, situated near the mouth of the Rhymney River.
  • D. Tuftonboro
    Tuftonboro is a small rural town in Carroll County, New Hampshire, known for its scenic setting along the shores of Lake Winnipesaukee.
  • E. Mapleton, Maine
    Mapleton, Maine is a small rural town in northern Maine known for its agricultural landscape and location within Aroostook County.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b915e3e881909125d760c15d0c29 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e5018256508190b024980e3a4a3ae9 completed April 19, 2026, 4:23 p.m.
Created at: April 10, 2026, 10:35 a.m.