Triple
T18303231
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Anson Jones |
E438410
|
entity |
| Predicate | spouse |
P13
|
FINISHED |
| Object | Mary Smith Jones |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mary Smith Jones | Statement: [Anson Jones, spouse, Mary Smith Jones]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Mary Smith Jones Context triple: [Anson Jones, spouse, Mary Smith Jones]
-
A.
Mary Smith Jones
chosen
Mary Smith Jones was the wife of Anson Jones, the last president of the Republic of Texas.
-
B.
Maria Smith
Maria Smith is an actress known for her role in the 1974 coming-of-age film "The Lords of Flatbush."
-
C.
Anna Smith
Anna Smith is a member of the fictional Smith family featured in the classic 1944 musical film "Meet Me in St. Louis."
-
D.
Anna Smith
Anna Smith is the wife of Mr. Alonzo Smith.
-
E.
Sarah Smith
Sarah Smith is a British filmmaker best known for co-directing the animated feature film "Ron’s Gone Wrong" and previously directing "Arthur Christmas."
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b915e3e881909125d760c15d0c29 |
completed | April 10, 2026, 8:47 a.m. |
| NER | Named-entity recognition | batch_69e5018176d481909536f50689f878d2 |
completed | April 19, 2026, 4:23 p.m. |
Created at: April 10, 2026, 10:35 a.m.