Triple
T18302069
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | United States military range complex |
E438380
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | military test and training infrastructure |
C22171
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: military test and training infrastructure Context triple: [United States military range complex, instanceOf, military test and training infrastructure]
-
A.
weapons testing facility
A weapons testing facility is a secure, controlled site where weapons and related systems are developed, evaluated, and tested for performance, safety, and reliability.
-
B.
military proving ground organization
A military proving ground organization is an entity responsible for planning, conducting, and evaluating tests and experiments of weapons, equipment, and tactics under controlled field conditions to validate performance, safety, and operational effectiveness.
-
C.
military installation
A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
-
D.
U.S. Navy training range
chosen
A U.S. Navy training range is a designated sea, air, or land area equipped and managed for conducting military exercises, weapons testing, and operational training to prepare naval forces for real-world missions.
-
E.
military training directorate
The military training directorate is the organizational unit responsible for planning, coordinating, and overseeing all training programs, standards, and curricula for military personnel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b915e3e881909125d760c15d0c29 |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:35 a.m.