Triple

T18290857
Position Surface form Disambiguated ID Type / Status
Subject Kundli industrial area E438108 entity
Predicate hasConnectivity P8776 FINISHED
Object Delhi–Kundli border road network NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Delhi–Kundli border road network | Statement: [Kundli industrial area, hasConnectivity, Delhi–Kundli border road network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Delhi–Kundli border road network
Context triple: [Kundli industrial area, hasConnectivity, Delhi–Kundli border road network]
  • A. Jammu–Pathankot road
    The Jammu–Pathankot road is a key highway in northern India that links Jammu and Kashmir with the state of Punjab, serving as a major route for regional travel and trade.
  • B. Delhi–Jaipur highway corridor
    The Delhi–Jaipur highway corridor is a major road link in northern India connecting the national capital region around Delhi with the city of Jaipur, facilitating significant commuter and freight traffic.
  • C. Batote–Kishtwar road
    The Batote–Kishtwar road is a mountainous highway in Jammu and Kashmir, India, that connects the town of Batote with Kishtwar through the rugged Chenab Valley.
  • D. Agra–Firozabad Road corridor
    The Agra–Firozabad Road corridor is a key regional transport route linking the historic city of Agra with the industrial hub of Firozabad in Uttar Pradesh, India.
  • E. Delhi–Haridwar National Highway
    The Delhi–Haridwar National Highway is a major roadway in northern India that connects the national capital, Delhi, with the pilgrimage city of Haridwar, serving as a key route for religious tourism and regional transport.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Delhi–Kundli border road network
Target entity description: The Delhi–Kundli border road network is a key transport corridor linking Delhi with the industrial hub of Kundli, facilitating regional trade, commuting, and logistics.
  • A. Jammu–Pathankot road
    The Jammu–Pathankot road is a key highway in northern India that links Jammu and Kashmir with the state of Punjab, serving as a major route for regional travel and trade.
  • B. Delhi–Jaipur highway corridor
    The Delhi–Jaipur highway corridor is a major road link in northern India connecting the national capital region around Delhi with the city of Jaipur, facilitating significant commuter and freight traffic.
  • C. Batote–Kishtwar road
    The Batote–Kishtwar road is a mountainous highway in Jammu and Kashmir, India, that connects the town of Batote with Kishtwar through the rugged Chenab Valley.
  • D. Agra–Firozabad Road corridor
    The Agra–Firozabad Road corridor is a key regional transport route linking the historic city of Agra with the industrial hub of Firozabad in Uttar Pradesh, India.
  • E. Delhi–Haridwar National Highway
    The Delhi–Haridwar National Highway is a major roadway in northern India that connects the national capital, Delhi, with the pilgrimage city of Haridwar, serving as a key route for religious tourism and regional transport.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b914530c8190b4474d862a2b2a1b completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e500fee5248190928e68ddaa4d90d7 completed April 19, 2026, 4:21 p.m.
Created at: April 10, 2026, 10:35 a.m.