Triple

T18279695
Position Surface form Disambiguated ID Type / Status
Subject M561 tractor unit E437831 entity
Predicate introducedAsPartOf P9721 FINISHED
Object M561 Gama Goat program NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M561 Gama Goat program | Statement: [M561 tractor unit, introducedAsPartOf, M561 Gama Goat program]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M561 Gama Goat program
Context triple: [M561 tractor unit, introducedAsPartOf, M561 Gama Goat program]
  • A. Helios program
    The Helios program was a joint NASA–German Aerospace Center mission in the 1970s that launched two probes to study the Sun at close range, setting records for both solar proximity and spacecraft speed.
  • B. SS-4 Sandal missile program
    The SS-4 Sandal missile program was a Soviet Cold War-era initiative to develop and deploy medium-range ballistic missiles capable of delivering nuclear warheads.
  • C. UR-100 missile program
    The UR-100 missile program was a Soviet intercontinental ballistic missile (ICBM) development effort that produced one of the most widely deployed strategic nuclear delivery systems of the Cold War.
  • D. R-26 missile program
    The R-26 missile program was a Soviet intercontinental ballistic missile development effort during the Cold War aimed at advancing the USSR's strategic nuclear capabilities.
  • E. Mir-NASA program
    The Mir-NASA program was a collaborative spaceflight initiative in the 1990s that sent American astronauts to live and work aboard Russia’s Mir space station, paving the way for later International Space Station cooperation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: M561 Gama Goat program
Target entity description: The M561 Gama Goat program was a U.S. military development effort to create a highly mobile, amphibious, articulated 6×6 tactical vehicle for rough-terrain transport during the Cold War era.
  • A. Helios program
    The Helios program was a joint NASA–German Aerospace Center mission in the 1970s that launched two probes to study the Sun at close range, setting records for both solar proximity and spacecraft speed.
  • B. SS-4 Sandal missile program
    The SS-4 Sandal missile program was a Soviet Cold War-era initiative to develop and deploy medium-range ballistic missiles capable of delivering nuclear warheads.
  • C. UR-100 missile program
    The UR-100 missile program was a Soviet intercontinental ballistic missile (ICBM) development effort that produced one of the most widely deployed strategic nuclear delivery systems of the Cold War.
  • D. R-26 missile program
    The R-26 missile program was a Soviet intercontinental ballistic missile development effort during the Cold War aimed at advancing the USSR's strategic nuclear capabilities.
  • E. Mir-NASA program
    The Mir-NASA program was a collaborative spaceflight initiative in the 1990s that sent American astronauts to live and work aboard Russia’s Mir space station, paving the way for later International Space Station cooperation.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b914530c8190b4474d862a2b2a1b completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e50054d1dc8190b31d02f617256e9d completed April 19, 2026, 4:18 p.m.
Created at: April 10, 2026, 10:34 a.m.