Triple

T18278145
Position Surface form Disambiguated ID Type / Status
Subject Tannay E437792 entity
Predicate hasTransportConnection P845 FINISHED
Object Coppet–Geneva railway line NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Coppet–Geneva railway line | Statement: [Tannay, hasTransportConnection, Coppet–Geneva railway line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Coppet–Geneva railway line
Context triple: [Tannay, hasTransportConnection, Coppet–Geneva railway line]
  • A. Neuchâtel–Pontarlier railway line
    The Neuchâtel–Pontarlier railway line is an international rail route connecting the Swiss city of Neuchâtel with Pontarlier in France, crossing the Jura region.
  • B. Vevey–Chexbres railway line
    The Vevey–Chexbres railway line is a short Swiss branch line in the canton of Vaud that climbs from the lakeside town of Vevey into the Lavaux vineyards, offering scenic connections to the main Lausanne–Bern route.
  • C. Bern–Neuchâtel railway line
    The Bern–Neuchâtel railway line is a key Swiss standard-gauge route connecting the federal city of Bern with Neuchâtel, serving both regional and intercity passenger traffic.
  • D. Yverdon–Neuchâtel railway line
    The Yverdon–Neuchâtel railway line is a standard-gauge rail route in western Switzerland that connects the towns of Yverdon-les-Bains and Neuchâtel along the southern shore of Lake Neuchâtel.
  • E. Fribourg–Yverdon railway line
    The Fribourg–Yverdon railway line is a standard-gauge Swiss rail route connecting the cities of Fribourg and Yverdon-les-Bains through the canton of Fribourg and the Broye region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Coppet–Geneva railway line
Target entity description: The Coppet–Geneva railway line is a key Swiss rail route linking the town of Coppet with the city of Geneva along the northwestern shore of Lake Geneva.
  • A. Neuchâtel–Pontarlier railway line
    The Neuchâtel–Pontarlier railway line is an international rail route connecting the Swiss city of Neuchâtel with Pontarlier in France, crossing the Jura region.
  • B. Vevey–Chexbres railway line
    The Vevey–Chexbres railway line is a short Swiss branch line in the canton of Vaud that climbs from the lakeside town of Vevey into the Lavaux vineyards, offering scenic connections to the main Lausanne–Bern route.
  • C. Bern–Neuchâtel railway line
    The Bern–Neuchâtel railway line is a key Swiss standard-gauge route connecting the federal city of Bern with Neuchâtel, serving both regional and intercity passenger traffic.
  • D. Yverdon–Neuchâtel railway line
    The Yverdon–Neuchâtel railway line is a standard-gauge rail route in western Switzerland that connects the towns of Yverdon-les-Bains and Neuchâtel along the southern shore of Lake Neuchâtel.
  • E. Fribourg–Yverdon railway line
    The Fribourg–Yverdon railway line is a standard-gauge Swiss rail route connecting the cities of Fribourg and Yverdon-les-Bains through the canton of Fribourg and the Broye region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b914530c8190b4474d862a2b2a1b completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e50053cc808190b46a3ec9d96936fe completed April 19, 2026, 4:18 p.m.
Created at: April 10, 2026, 10:34 a.m.