Triple

T18277074
Position Surface form Disambiguated ID Type / Status
Subject Port of Foshan E437763 entity
Predicate partOf P40 FINISHED
Object Pearl River waterway system NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pearl River waterway system | Statement: [Port of Foshan, partOf, Pearl River waterway system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pearl River waterway system
Context triple: [Port of Foshan, partOf, Pearl River waterway system]
  • A. East Coast Inland Waterway
    The East Coast Inland Waterway is a protected navigable water route along the Atlantic seaboard of the United States, used primarily by recreational and commercial vessels as an alternative to open-ocean travel.
  • B. Illinois Waterway system
    The Illinois Waterway system is a network of rivers, canals, and locks in Illinois that provides a vital navigable link between the Great Lakes and the Mississippi River.
  • C. McClellan–Kerr Arkansas River Navigation System
    The McClellan–Kerr Arkansas River Navigation System is a major inland waterway project that transforms the Arkansas River and connected channels into a navigable route for commercial shipping between the Midwest and the Gulf of Mexico.
  • D. Tennessee-Tombigbee Waterway
    The Tennessee-Tombigbee Waterway is a man-made navigation route linking the Tennessee River to the Gulf of Mexico, providing an alternative inland shipping corridor to the Mississippi River system.
  • E. Burns Waterway
    Burns Waterway is a man-made channel in northwest Indiana that connects inland waterways to Lake Michigan near the city of Portage.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Pearl River waterway system
Target entity description: The Pearl River waterway system is an extensive network of navigable rivers and channels in southern China that serves as a major corridor for regional trade and transportation.
  • A. East Coast Inland Waterway
    The East Coast Inland Waterway is a protected navigable water route along the Atlantic seaboard of the United States, used primarily by recreational and commercial vessels as an alternative to open-ocean travel.
  • B. Illinois Waterway system
    The Illinois Waterway system is a network of rivers, canals, and locks in Illinois that provides a vital navigable link between the Great Lakes and the Mississippi River.
  • C. McClellan–Kerr Arkansas River Navigation System
    The McClellan–Kerr Arkansas River Navigation System is a major inland waterway project that transforms the Arkansas River and connected channels into a navigable route for commercial shipping between the Midwest and the Gulf of Mexico.
  • D. Tennessee-Tombigbee Waterway
    The Tennessee-Tombigbee Waterway is a man-made navigation route linking the Tennessee River to the Gulf of Mexico, providing an alternative inland shipping corridor to the Mississippi River system.
  • E. Burns Waterway
    Burns Waterway is a man-made channel in northwest Indiana that connects inland waterways to Lake Michigan near the city of Portage.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b914530c8190b4474d862a2b2a1b completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e500528bb88190a9f9ba6428cc2076 completed April 19, 2026, 4:18 p.m.
Created at: April 10, 2026, 10:34 a.m.