Triple
T18276073
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Western Nautical Highway |
E437737
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | roll-on/roll-off shipping route |
C1422
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: roll-on/roll-off shipping route Context triple: [Western Nautical Highway, instanceOf, roll-on/roll-off shipping route]
-
A.
shipping route
chosen
A shipping route is a predefined path or corridor used by vessels or carriers to transport goods between specific origins and destinations, often optimized for safety, cost, and transit time.
-
B.
sea route
A sea route is a navigable path across seas or oceans used by ships to travel between ports for trade, transport, or exploration.
-
C.
transportation route
A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
-
D.
riverine trade route
A riverine trade route is a navigable waterway along a river system used for the transport and exchange of goods, people, and cultural influences between settlements.
-
E.
container shipping company
A container shipping company is a business that transports standardized cargo containers across oceans and other waterways using a fleet of specialized vessels, managing logistics, routing, and port operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b914530c8190b4474d862a2b2a1b |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:34 a.m.