Triple

T18276059
Position Surface form Disambiguated ID Type / Status
Subject Pantabangan River E437736 entity
Predicate associatedWithStructure P2830 FINISHED
Object Pantabangan Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pantabangan Dam | Statement: [Pantabangan River, associatedWithStructure, Pantabangan Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pantabangan Dam
Context triple: [Pantabangan River, associatedWithStructure, Pantabangan Dam]
  • A. Pantabangan Dam chosen
    Pantabangan Dam is a major multi-purpose dam in the Philippines known for irrigation, flood control, and hydroelectric power generation in Central Luzon.
  • B. Nangbeto Dam
    Nangbeto Dam is a hydroelectric and irrigation dam on the Mono River in West Africa, jointly developed by Togo and Benin to generate power and support regional water management.
  • C. Saguling Dam
    Saguling Dam is a major hydroelectric and multipurpose dam in West Java, Indonesia, forming one of the key reservoirs on the Citarum River.
  • D. Mangahao Dam
    Mangahao Dam is a hydroelectric dam in New Zealand that forms part of one of the country’s earliest major power schemes.
  • E. Pracana Dam
    Pracana Dam is a hydroelectric and water management dam located on the Ocreza River in central Portugal, contributing to the regulation and use of resources in the Tagus River basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b914530c8190b4474d862a2b2a1b completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e50051bccc8190832eacdb6945d6b7 completed April 19, 2026, 4:18 p.m.
Created at: April 10, 2026, 10:34 a.m.