Triple

T18258917
Position Surface form Disambiguated ID Type / Status
Subject Baldovie E437292 entity
Predicate hasWasteFacility P117438 FINISHED
Object Baldovie Energy from Waste plant NE NERFINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Baldovie Energy from Waste plant | Statement: [Baldovie, hasWasteFacility, Baldovie Energy from Waste plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Baldovie Energy from Waste plant
Context triple: [Baldovie, hasWasteFacility, Baldovie Energy from Waste plant]
  • A. Cluny Power Station
    Cluny Power Station is a hydroelectric power facility in Tasmania that generates electricity using water from the Cluny Dam on the Derwent River.
  • B. Johnson-Cobbe Energy Centre
    The Johnson-Cobbe Energy Centre is an advanced energy and technology training and research facility at the Southern Alberta Institute of Technology, focused on power engineering and sustainable energy systems.
  • C. Callide Power Station
    Callide Power Station is a coal-fired power station in Central Queensland, Australia, that supplies electricity to the regional and national grid.
  • D. Marchwood Power Station
    Marchwood Power Station is a modern gas-fired power plant in Hampshire, England, that generates electricity for the UK national grid.
  • E. Kendal Power Station
    Kendal Power Station is one of South Africa’s largest coal-fired power plants, supplying significant electricity to the national grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Baldovie Energy from Waste plant
Target entity description: The Baldovie Energy from Waste plant is a facility in Dundee, Scotland that incinerates municipal waste to generate electricity and reduce landfill use.
  • A. Cluny Power Station
    Cluny Power Station is a hydroelectric power facility in Tasmania that generates electricity using water from the Cluny Dam on the Derwent River.
  • B. Johnson-Cobbe Energy Centre
    The Johnson-Cobbe Energy Centre is an advanced energy and technology training and research facility at the Southern Alberta Institute of Technology, focused on power engineering and sustainable energy systems.
  • C. Callide Power Station
    Callide Power Station is a coal-fired power station in Central Queensland, Australia, that supplies electricity to the regional and national grid.
  • D. Marchwood Power Station
    Marchwood Power Station is a modern gas-fired power plant in Hampshire, England, that generates electricity for the UK national grid.
  • E. Kendal Power Station
    Kendal Power Station is one of South Africa’s largest coal-fired power plants, supplying significant electricity to the national grid.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasWasteFacility
Context triple: [Baldovie, hasWasteFacility, Baldovie Energy from Waste plant]
  • A. wasteManagementFacility chosen
    Indicates a facility where waste materials are collected, processed, treated, or disposed of as part of a waste management system.
  • B. containsWasteFrom
    Indicates that one entity holds, includes, or is contaminated by waste originating from another entity.
  • C. hasCleaningFacility
    Indicates that an entity provides or is equipped with a facility or service for cleaning.
  • D. wasteManagement
    Indicates the handling, treatment, and disposal relationship between entities and the waste materials they produce or manage.
  • E. hasIndustrialPlant
    Indicates that an entity possesses, operates, or is associated with an industrial plant facility.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b913351c8190932b6a426de04b41 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4fd89899c8190b8b652c4f61aa5cf completed April 19, 2026, 4:06 p.m.
PD Predicate disambiguation batch_69e44fcdee748190bae6fb76e0cb22f3 completed April 19, 2026, 3:45 a.m.
Created at: April 10, 2026, 10:34 a.m.