Triple
T1824924
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Runway 14R/32L |
E40630
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | commercial aviation infrastructure |
C2678
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: commercial aviation infrastructure Context triple: [Runway 14R/32L, instanceOf, commercial aviation infrastructure]
-
A.
commercial airliner
A commercial airliner is a large, powered aircraft designed to transport passengers and cargo on scheduled routes between airports.
-
B.
airport system
An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
-
C.
cargo airport
A cargo airport is a specialized aviation facility designed primarily for the handling, storage, and transportation of freight and mail, featuring extensive logistics infrastructure and limited or no passenger services.
-
D.
airfield
An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
-
E.
airport runway
chosen
An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8864644bc8190b2358ab897194ac1 |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:32 p.m.