Triple

T18241716
Position Surface form Disambiguated ID Type / Status
Subject Moradabad Junction railway station E436829 entity
Predicate connectsRoute P845 FINISHED
Object Moradabad–Saharanpur line NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Moradabad–Saharanpur line | Statement: [Moradabad Junction railway station, connectsRoute, Moradabad–Saharanpur line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Moradabad–Saharanpur line
Context triple: [Moradabad Junction railway station, connectsRoute, Moradabad–Saharanpur line]
  • A. Aligarh–Moradabad line
    The Aligarh–Moradabad line is a key railway route in the Indian state of Uttar Pradesh that connects the cities of Aligarh and Moradabad and forms part of the Northern Railway network.
  • B. Lucknow–Moradabad line
    The Lucknow–Moradabad line is a key railway route in northern India connecting the cities of Lucknow and Moradabad and serving important intermediate junctions such as Bareilly.
  • C. Ambala–Saharanpur line
    The Ambala–Saharanpur line is a key railway route in northern India connecting Ambala in Haryana with Saharanpur in Uttar Pradesh, serving as an important regional passenger and freight corridor.
  • D. Delhi–Moradabad line
    The Delhi–Moradabad line is a major railway route in northern India that connects the national capital region with the city of Moradabad and forms part of important passenger and freight corridors.
  • E. Meerut–Khatauli line
    The Meerut–Khatauli line is a railway route in the Indian state of Uttar Pradesh that connects the city of Meerut with the town of Khatauli, serving as part of the regional rail network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Moradabad–Saharanpur line
Target entity description: The Moradabad–Saharanpur line is a key railway route in northern India that links the cities of Moradabad and Saharanpur, facilitating regional passenger and freight transport.
  • A. Aligarh–Moradabad line
    The Aligarh–Moradabad line is a key railway route in the Indian state of Uttar Pradesh that connects the cities of Aligarh and Moradabad and forms part of the Northern Railway network.
  • B. Lucknow–Moradabad line
    The Lucknow–Moradabad line is a key railway route in northern India connecting the cities of Lucknow and Moradabad and serving important intermediate junctions such as Bareilly.
  • C. Ambala–Saharanpur line
    The Ambala–Saharanpur line is a key railway route in northern India connecting Ambala in Haryana with Saharanpur in Uttar Pradesh, serving as an important regional passenger and freight corridor.
  • D. Delhi–Moradabad line
    The Delhi–Moradabad line is a major railway route in northern India that connects the national capital region with the city of Moradabad and forms part of important passenger and freight corridors.
  • E. Meerut–Khatauli line
    The Meerut–Khatauli line is a railway route in the Indian state of Uttar Pradesh that connects the city of Meerut with the town of Khatauli, serving as part of the regional rail network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b91104e08190a8241f7d260a5162 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4f7e387f481909d72574fb7d17923 completed April 19, 2026, 3:42 p.m.
Created at: April 10, 2026, 10:33 a.m.