Triple
T18230277
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IEC 61158 |
E436526
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fieldbus standard |
C15881
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fieldbus standard Context triple: [IEC 61158, instanceOf, fieldbus standard]
-
A.
fieldbus system
chosen
A fieldbus system is an industrial network architecture that connects and coordinates field devices such as sensors and actuators with controllers for real-time data exchange and process automation.
-
B.
serial bus interface standard
A serial bus interface standard defines the electrical, timing, and protocol rules that govern how devices communicate and exchange data over a serial communication bus.
-
C.
substation automation standard
A substation automation standard defines the protocols, architectures, and requirements that enable interoperable, secure, and automated monitoring, control, and protection of electrical substations.
-
D.
IEEE standard
An IEEE standard is a formally documented set of technical specifications and guidelines developed and maintained by the Institute of Electrical and Electronics Engineers to ensure interoperability, safety, and quality across electrical, electronic, and computing technologies.
-
E.
IEC system
An IEC system is an Interactive Evolutionary Computation framework in which human users iteratively evaluate and select candidate solutions so that an evolutionary algorithm can optimize designs, media, or parameters based on subjective preferences.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9103a8081908bbb0836fef10efd |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:33 a.m.