Triple

T18228486
Position Surface form Disambiguated ID Type / Status
Subject Idaho Falls River Walk E436480 entity
Predicate instanceOf P0 FINISHED
Object multi-use pathway C31426 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multi-use pathway
Context triple: [Idaho Falls River Walk, instanceOf, multi-use pathway]
  • A. multi-purpose facility
    A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
  • B. shared path chosen
    A shared path is a common route or process used collaboratively by multiple entities to reach aligned goals or destinations.
  • C. multipurpose bridge
    A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
  • D. development pathway
    A development pathway is a structured sequence of stages, actions, and decisions that guide the progression from an initial state or idea toward a defined goal or mature outcome.
  • E. overflow pathway
    An overflow pathway is a secondary route or channel designed to safely divert excess flow—such as water, traffic, or data—when the primary system reaches or exceeds its capacity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9103a8081908bbb0836fef10efd completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:33 a.m.