Triple

T18226822
Position Surface form Disambiguated ID Type / Status
Subject BloombergNEF E436442 entity
Predicate formerName P65 FINISHED
Object New Energy Finance NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New Energy Finance | Statement: [BloombergNEF, formerName, New Energy Finance]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New Energy Finance
Context triple: [BloombergNEF, formerName, New Energy Finance]
  • A. BloombergNEF chosen
    BloombergNEF is a research service that provides data-driven analysis, forecasts, and insights on clean energy, advanced transport, digital industry, and climate finance for investors, policymakers, and corporations.
  • B. New Energy
    New Energy is a critically acclaimed 2017 electronic music album by British producer Four Tet, known for its intricate, atmospheric soundscapes and genre-blending production.
  • C. Centre for Energy
    The Centre for Energy is a specialized research hub at IIT Guwahati focused on advanced studies and innovation in energy technologies and sustainable energy systems.
  • D. BP Alternative Energy
    BP Alternative Energy is a business division of BP focused on developing and operating low-carbon and renewable energy solutions such as wind, solar, and bioenergy projects.
  • E. Institute of Energy
    The Institute of Energy is a specialized faculty of Saint Petersburg Polytechnic Institute focused on education and research in power engineering and energy technologies.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9103a8081908bbb0836fef10efd completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4f4aff8748190be5e732f9dbc8dff completed April 19, 2026, 3:28 p.m.
Created at: April 10, 2026, 10:32 a.m.