Triple

T18219260
Position Surface form Disambiguated ID Type / Status
Subject Algarve Cup E436248 entity
Predicate usualStartMonth P11688 FINISHED
Object March LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: March | Statement: [Algarve Cup, usualStartMonth, March]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usualStartMonth
Context triple: [Algarve Cup, usualStartMonth, March]
  • A. typicalStartPeriod
    Indicates the usual or standard time period during which something begins or is initiated.
  • B. typicallyOpenFromMonth
    Indicates the month from which something (such as a place, service, or facility) is usually open or begins operating.
  • C. typicalMonthOfOccurrence chosen
    Indicates the month in which something most commonly or typically occurs.
  • D. typicalStandardTimeStartMonth
    Indicates the month in which a region’s standard (non-daylight-saving) time typically begins each year.
  • E. typicalMeetingMonth
    Indicates the month in which an entity most commonly or usually holds its meetings.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9103a8081908bbb0836fef10efd completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4e47926988190802c00b074cdc696 completed April 19, 2026, 2:19 p.m.
PD Predicate disambiguation batch_69e4332155d88190b106d0dceb4554af completed April 19, 2026, 1:42 a.m.
Created at: April 10, 2026, 10:32 a.m.