Triple

T18209011
Position Surface form Disambiguated ID Type / Status
Subject Государственный универсальный магазин E435980 entity
Predicate instanceOf P0 FINISHED
Object торговый центр C7379 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: торговый центр
Context triple: [Государственный универсальный магазин, instanceOf, торговый центр]
  • A. shopping centre
    A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
  • B. shopping mall
    A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
  • C. shopping area
    A shopping area is a designated space, such as a street, district, or complex, where multiple retail stores and related services are concentrated for consumer purchasing and leisure activities.
  • D. regional center
    A regional center is an organization or facility that provides specialized services, coordination, and support to a defined geographic area, often acting as a hub for resources, administration, or expertise.
  • E. department store chosen
    A department store is a large retail establishment that offers a wide variety of goods, such as clothing, home furnishings, cosmetics, and appliances, organized into specialized departments under one roof.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90dba6481908e119eb9aa4ca0cb completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:32 a.m.