Triple

T18201621
Position Surface form Disambiguated ID Type / Status
Subject Spalding Mission site E435803 entity
Predicate instanceOf P0 FINISHED
Object mission station C33689 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mission station
Context triple: [Spalding Mission site, instanceOf, mission station]
  • A. mission system
    A mission system is a coordinated set of processes, tools, and resources designed to plan, execute, monitor, and evaluate the completion of specific operational or strategic objectives.
  • B. mission church
    A mission church is a religious building or congregation established by a parent church or missionary organization to serve a specific community, often in a developing or newly evangelized area.
  • C. missionary directive
    A missionary directive is an authoritative instruction or set of guidelines that defines the goals, methods, and ethical boundaries for individuals or groups engaged in religious outreach or proselytizing activities.
  • D. Seventh-day Adventist mission station
    A Seventh-day Adventist mission station is a religious outpost established by the Seventh-day Adventist Church to evangelize, provide education and healthcare, and support community development in a specific region.
  • E. Christian mission station chosen
    A Christian mission station is a settlement or compound established by missionaries to evangelize, provide religious instruction, and often offer education, medical care, and social services to a local community.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90dba6481908e119eb9aa4ca0cb completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:32 a.m.