Triple
T18193543
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lilla Edet Municipality |
E435601
|
entity |
| Predicate | hasHydropowerPlant |
P15311
|
FINISHED |
| Object | Lilla Edet hydropower plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lilla Edet hydropower plant | Statement: [Lilla Edet Municipality, hasHydropowerPlant, Lilla Edet hydropower plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Lilla Edet hydropower plant Context triple: [Lilla Edet Municipality, hasHydropowerPlant, Lilla Edet hydropower plant]
-
A.
Älvkarleby hydropower station
Älvkarleby hydropower station is a major Swedish hydroelectric facility on the Dalälven River, known for its early 20th-century construction and role in regional power generation.
-
B.
Tonstad Hydropower Station
Tonstad Hydropower Station is one of Norway’s largest hydroelectric power plants, known for its significant electricity production and role in the country’s renewable energy supply.
-
C.
Lysebotn Hydropower Station
Lysebotn Hydropower Station is a major Norwegian hydroelectric power plant located at the end of the Lysefjord, known for its large underground facilities and significant electricity production.
-
D.
Siljan hydroelectric installations
The Siljan hydroelectric installations are a series of power-generating facilities in the Siljan region of Sweden that harness the flow of the Dalälven river to produce renewable electricity.
-
E.
Trollhättan hydropower area
Trollhättan hydropower area is a major Swedish hydroelectric power complex built around the Trollhättan Falls on the Göta älv river, known for its dams, power stations, and role in regional energy production.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Lilla Edet hydropower plant Target entity description: Lilla Edet hydropower plant is a hydroelectric facility in western Sweden that harnesses the Göta älv river to generate renewable electricity.
-
A.
Älvkarleby hydropower station
Älvkarleby hydropower station is a major Swedish hydroelectric facility on the Dalälven River, known for its early 20th-century construction and role in regional power generation.
-
B.
Tonstad Hydropower Station
Tonstad Hydropower Station is one of Norway’s largest hydroelectric power plants, known for its significant electricity production and role in the country’s renewable energy supply.
-
C.
Lysebotn Hydropower Station
Lysebotn Hydropower Station is a major Norwegian hydroelectric power plant located at the end of the Lysefjord, known for its large underground facilities and significant electricity production.
-
D.
Siljan hydroelectric installations
The Siljan hydroelectric installations are a series of power-generating facilities in the Siljan region of Sweden that harness the flow of the Dalälven river to produce renewable electricity.
-
E.
Trollhättan hydropower area
chosen
Trollhättan hydropower area is a major Swedish hydroelectric power complex built around the Trollhättan Falls on the Göta älv river, known for its dams, power stations, and role in regional energy production.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b90c7ec081909b4694ccecb449c6 |
completed | April 10, 2026, 8:47 a.m. |
| NER | Named-entity recognition | batch_69e4e0d12b688190842375dcc5d5537c |
completed | April 19, 2026, 2:04 p.m. |
Created at: April 10, 2026, 10:31 a.m.