Triple

T18181792
Position Surface form Disambiguated ID Type / Status
Subject Livingston, Scotland E435302 entity
Predicate hasNearbyMotorway P385 FINISHED
Object M8 motorway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M8 motorway | Statement: [Livingston, Scotland, hasNearbyMotorway, M8 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M8 motorway
Context triple: [Livingston, Scotland, hasNearbyMotorway, M8 motorway]
  • A. M8 motorway chosen
    The M8 motorway is a major Scottish highway linking the cities of Glasgow and Edinburgh and serving as a key east–west transport corridor across the Central Belt.
  • B. M8 motorway
    The M8 motorway is a major Irish highway linking Cork to Dublin, forming a key part of the country’s primary inter-urban road network.
  • C. M7 motorway
    The M7 motorway is a major Hungarian highway that links Budapest with Lake Balaton and continues toward the Croatian border, serving as a key route in southwestern Hungary.
  • D. M7 motorway
    The M7 motorway is a major Irish route connecting Dublin with Limerick and serving as a key part of the country’s primary east–west transport corridor.
  • E. M9 motorway
    The M9 motorway is a major Scottish highway connecting Edinburgh to Stirling and the Highlands, serving as a key transport route through central Scotland.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90c7ec081909b4694ccecb449c6 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4dffb3bc88190a627be9c444d5c7d completed April 19, 2026, 2 p.m.
Created at: April 10, 2026, 10:31 a.m.