Triple

T18162327
Position Surface form Disambiguated ID Type / Status
Subject Arrábida Bridge E434796 entity
Predicate partOf P40 FINISHED
Object Porto road network NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Porto road network | Statement: [Arrábida Bridge, partOf, Porto road network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Porto road network
Context triple: [Arrábida Bridge, partOf, Porto road network]
  • A. Lisbon public transport network
    The Lisbon public transport network is the integrated system of trams, buses, metro lines, funiculars, lifts, and suburban trains that serves the city of Lisbon and its surrounding areas.
  • B. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • C. Porto metropolitan public transport network
    The Porto metropolitan public transport network is the integrated system of buses, metro, and other public transit services that connects the city of Porto with its surrounding metropolitan area.
  • D. Porto commuter rail system
    The Porto commuter rail system is a suburban railway network serving the Porto metropolitan area in Portugal, connecting the city with surrounding towns and suburbs through frequent regional train services.
  • E. Lisbon streets
    Lisbon streets are the atmospheric urban backdrop of Portugal’s capital, known for their steep hills, cobblestone pavements, and historic trams winding through colorful, timeworn neighborhoods.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Porto road network
Target entity description: The Porto road network is the interconnected system of streets, avenues, and bridges that supports vehicular traffic and urban mobility throughout the city of Porto, Portugal.
  • A. Lisbon public transport network
    The Lisbon public transport network is the integrated system of trams, buses, metro lines, funiculars, lifts, and suburban trains that serves the city of Lisbon and its surrounding areas.
  • B. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • C. Porto metropolitan public transport network
    The Porto metropolitan public transport network is the integrated system of buses, metro, and other public transit services that connects the city of Porto with its surrounding metropolitan area.
  • D. Porto commuter rail system
    The Porto commuter rail system is a suburban railway network serving the Porto metropolitan area in Portugal, connecting the city with surrounding towns and suburbs through frequent regional train services.
  • E. Lisbon streets
    Lisbon streets are the atmospheric urban backdrop of Portugal’s capital, known for their steep hills, cobblestone pavements, and historic trams winding through colorful, timeworn neighborhoods.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90b7a188190b3fc7b8d4a6cd20a completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4dec32530819099d906640a07e92c completed April 19, 2026, 1:55 p.m.
Created at: April 10, 2026, 10:30 a.m.