Triple
T18142679
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Penal Laws in Ireland |
E434300
|
entity |
| Predicate | gradualRelaxationBegan |
P107554
|
FINISHED |
| Object | late 18th century |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: late 18th century | Statement: [Penal Laws in Ireland, gradualRelaxationBegan, late 18th century]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: gradualRelaxationBegan Context triple: [Penal Laws in Ireland, gradualRelaxationBegan, late 18th century]
-
A.
hasRelaxation
chosen
Indicates that one entity provides or is associated with a relaxation, easing, or reduction of constraints, tension, or strictness in relation to another entity.
-
B.
adoptedGraduallyBy
Indicates that one entity is taken up, accepted, or implemented by another entity in a slow, incremental, or phased manner over time.
-
C.
graduallyRenamedAs
Indicates that one entity’s name was changed to another entity’s name through a gradual or phased renaming process over time.
-
D.
restorationBeganWith
Indicates that the initiation of a restoration process started with or was triggered by a specified prior event, action, or condition.
-
E.
delayed
Indicates that an expected event, action, or outcome occurred later than its scheduled or usual time.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b90aac308190801e2c57d8c5bfe5 |
completed | April 10, 2026, 8:47 a.m. |
| NER | Named-entity recognition | batch_69e4de0c8aa88190b4ded7e6d05f6edf |
completed | April 19, 2026, 1:52 p.m. |
| PD | Predicate disambiguation | batch_69e43317d11c81908d1dc14921566b47 |
completed | April 19, 2026, 1:42 a.m. |
Created at: April 10, 2026, 10:29 a.m.