Triple

T18126182
Position Surface form Disambiguated ID Type / Status
Subject Duncan Dam E433880 entity
Predicate operator P179 FINISHED
Object BC Hydro NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: BC Hydro | Statement: [Duncan Dam, operator, BC Hydro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: BC Hydro
Context triple: [Duncan Dam, operator, BC Hydro]
  • A. BC Hydro chosen
    BC Hydro is a Canadian provincial Crown corporation responsible for generating, purchasing, distributing, and selling electricity in British Columbia.
  • B. Alectra Utilities
    Alectra Utilities is a major Canadian energy company that distributes electricity to customers across several communities in Ontario.
  • C. Ontario Hydro
    Ontario Hydro was the former publicly owned electric utility in Ontario, Canada, responsible for generation and transmission of electricity before its restructuring into successor companies.
  • D. TransAlta
    TransAlta is a Canadian power generation and wholesale marketing company known for operating a diverse portfolio of electricity assets, including significant wind energy projects.
  • E. Newfoundland and Labrador Hydro
    Newfoundland and Labrador Hydro is a provincial Crown-owned electric utility in Newfoundland and Labrador responsible for generating and transmitting electricity across the province.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b909e8cc81908df4cc2b8ea6d11f completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4ddee1efc8190b04324b98de5c9d0 completed April 19, 2026, 1:51 p.m.
Created at: April 10, 2026, 10:29 a.m.