Triple

T18113746
Position Surface form Disambiguated ID Type / Status
Subject Lier E433544 entity
Predicate railwayLine P848 FINISHED
Object Vestfold Line NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vestfold Line | Statement: [Lier, railwayLine, Vestfold Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Vestfold Line
Context triple: [Lier, railwayLine, Vestfold Line]
  • A. Vestfold Line chosen
    The Vestfold Line is a key railway route in southeastern Norway that connects Oslo with towns along the western shore of the Oslofjord, serving as an important corridor for both passenger and regional traffic.
  • B. Arendal Line
    The Arendal Line is a Norwegian railway route that connects the coastal town of Arendal to the national rail network.
  • C. Randsfjord Line
    The Randsfjord Line is a historic Norwegian railway line connecting Drammen to Hønefoss, once an important route for both passenger and freight traffic in southeastern Norway.
  • D. Solør Line
    Solør Line is a Norwegian railway line running through the Solør district in Innlandet county, historically important for both passenger and freight transport.
  • E. Roa–Hønefoss Line
    The Roa–Hønefoss Line is a Norwegian railway line that connects the Bergen Line to the Gjøvik Line, serving as an important link between eastern and western Norway.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90916008190a1f110bd7ced5473 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4ddd3fd9c81909bfe95927f7553e3 completed April 19, 2026, 1:51 p.m.
Created at: April 10, 2026, 10:28 a.m.