Triple

T18112265
Position Surface form Disambiguated ID Type / Status
Subject National Route 12 (Argentina) E433507 entity
Predicate alsoKnownAs P39 FINISHED
Object Ruta Nacional 12 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ruta Nacional 12 | Statement: [National Route 12 (Argentina), alsoKnownAs, Ruta Nacional 12]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ruta Nacional 12
Context triple: [National Route 12 (Argentina), alsoKnownAs, Ruta Nacional 12]
  • A. Ruta Nacional 19
    Ruta Nacional 19 is a major Argentine highway that connects the cities of Santa Fe and Córdoba, serving as an important corridor in the country's central region.
  • B. Ruta Nacional 68
    Ruta Nacional 68 is a scenic highway in northwestern Argentina that connects the city of Salta with the Calchaquí Valleys, passing through striking mountain and canyon landscapes.
  • C. Ruta Nacional 9
    Ruta Nacional 9 is a major Argentine highway that runs from Buenos Aires through several northern provinces to the Bolivian border, serving as a key transportation corridor in the country.
  • D. Ruta Nacional 32
    Ruta Nacional 32 is a major Costa Rican highway that connects the capital city of San José with the Caribbean port city of Limón, serving as a key route for commerce and travel across the country.
  • E. Ruta Nacional 5
    Ruta Nacional 5 is a major Argentine highway that connects Buenos Aires with the interior of the Buenos Aires and La Pampa provinces, serving as an important transportation corridor in central Argentina.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ruta Nacional 12
Target entity description: Ruta Nacional 12 is a major Argentine highway that runs through the northeastern provinces, connecting Buenos Aires with the Mesopotamia region and the border with Paraguay and Brazil.
  • A. Ruta Nacional 19
    Ruta Nacional 19 is a major Argentine highway that connects the cities of Santa Fe and Córdoba, serving as an important corridor in the country's central region.
  • B. Ruta Nacional 68
    Ruta Nacional 68 is a scenic highway in northwestern Argentina that connects the city of Salta with the Calchaquí Valleys, passing through striking mountain and canyon landscapes.
  • C. Ruta Nacional 9
    Ruta Nacional 9 is a major Argentine highway that runs from Buenos Aires through several northern provinces to the Bolivian border, serving as a key transportation corridor in the country.
  • D. Ruta Nacional 32
    Ruta Nacional 32 is a major Costa Rican highway that connects the capital city of San José with the Caribbean port city of Limón, serving as a key route for commerce and travel across the country.
  • E. Ruta Nacional 5
    Ruta Nacional 5 is a major Argentine highway that connects Buenos Aires with the interior of the Buenos Aires and La Pampa provinces, serving as an important transportation corridor in central Argentina.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90916008190a1f110bd7ced5473 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4ddd3422c81908396a21bd53f3e47 completed April 19, 2026, 1:51 p.m.
Created at: April 10, 2026, 10:28 a.m.