Triple
T18112265
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Route 12 (Argentina) |
E433507
|
entity |
| Predicate | alsoKnownAs |
P39
|
FINISHED |
| Object | Ruta Nacional 12 |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ruta Nacional 12 | Statement: [National Route 12 (Argentina), alsoKnownAs, Ruta Nacional 12]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ruta Nacional 12 Context triple: [National Route 12 (Argentina), alsoKnownAs, Ruta Nacional 12]
-
A.
Ruta Nacional 19
Ruta Nacional 19 is a major Argentine highway that connects the cities of Santa Fe and Córdoba, serving as an important corridor in the country's central region.
-
B.
Ruta Nacional 68
Ruta Nacional 68 is a scenic highway in northwestern Argentina that connects the city of Salta with the Calchaquí Valleys, passing through striking mountain and canyon landscapes.
-
C.
Ruta Nacional 9
Ruta Nacional 9 is a major Argentine highway that runs from Buenos Aires through several northern provinces to the Bolivian border, serving as a key transportation corridor in the country.
-
D.
Ruta Nacional 32
Ruta Nacional 32 is a major Costa Rican highway that connects the capital city of San José with the Caribbean port city of Limón, serving as a key route for commerce and travel across the country.
-
E.
Ruta Nacional 5
Ruta Nacional 5 is a major Argentine highway that connects Buenos Aires with the interior of the Buenos Aires and La Pampa provinces, serving as an important transportation corridor in central Argentina.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Ruta Nacional 12 Target entity description: Ruta Nacional 12 is a major Argentine highway that runs through the northeastern provinces, connecting Buenos Aires with the Mesopotamia region and the border with Paraguay and Brazil.
-
A.
Ruta Nacional 19
Ruta Nacional 19 is a major Argentine highway that connects the cities of Santa Fe and Córdoba, serving as an important corridor in the country's central region.
-
B.
Ruta Nacional 68
Ruta Nacional 68 is a scenic highway in northwestern Argentina that connects the city of Salta with the Calchaquí Valleys, passing through striking mountain and canyon landscapes.
-
C.
Ruta Nacional 9
Ruta Nacional 9 is a major Argentine highway that runs from Buenos Aires through several northern provinces to the Bolivian border, serving as a key transportation corridor in the country.
-
D.
Ruta Nacional 32
Ruta Nacional 32 is a major Costa Rican highway that connects the capital city of San José with the Caribbean port city of Limón, serving as a key route for commerce and travel across the country.
-
E.
Ruta Nacional 5
Ruta Nacional 5 is a major Argentine highway that connects Buenos Aires with the interior of the Buenos Aires and La Pampa provinces, serving as an important transportation corridor in central Argentina.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b90916008190a1f110bd7ced5473 |
completed | April 10, 2026, 8:47 a.m. |
| NER | Named-entity recognition | batch_69e4ddd3422c81908396a21bd53f3e47 |
completed | April 19, 2026, 1:51 p.m. |
Created at: April 10, 2026, 10:28 a.m.