Triple
T18107611
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Blenheim-Gilboa Pumped Storage Power Project |
E433384
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pumped-storage hydroelectric power station |
C19469
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pumped-storage hydroelectric power station Context triple: [Blenheim-Gilboa Pumped Storage Power Project, instanceOf, pumped-storage hydroelectric power station]
-
A.
hydroelectric power complex
chosen
A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
-
B.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
C.
run-of-the-river hydroelectric power plant
A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
-
D.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
E.
hydro-wind power plant
A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b90916008190a1f110bd7ced5473 |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:28 a.m.