Triple
T18078338
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Francorail |
E432617
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway manufacturing consortium |
C14575
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway manufacturing consortium Context triple: [Francorail, instanceOf, railway manufacturing consortium]
-
A.
rail transport manufacturer
A rail transport manufacturer is a company that designs, engineers, and produces railway vehicles and related equipment such as locomotives, passenger cars, freight wagons, and signaling systems.
-
B.
railway holding company
A railway holding company is a parent corporation that owns and controls one or more railway operating or infrastructure companies, managing their strategic direction and financial interests without necessarily running day-to-day train operations itself.
-
C.
group of railway companies
chosen
A group of railway companies is an organized association of multiple rail transport operators that collaborate or are collectively managed to provide coordinated rail services, share resources, or pursue common commercial or regulatory interests.
-
D.
rolling stock manufacturer
A rolling stock manufacturer is a company that designs, builds, and often maintains railway vehicles such as locomotives, passenger coaches, and freight wagons.
-
E.
carriage manufacturer
A carriage manufacturer is a business or craftsman that designs, builds, and assembles horse-drawn vehicles for transportation or specialized use.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9070cac81909fa9473fb1c3f1c7 |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:27 a.m.