Triple

T18077783
Position Surface form Disambiguated ID Type / Status
Subject STS-132 E432601 entity
Predicate nextMission P36269 FINISHED
Object STS-133 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-133 | Statement: [STS-132, nextMission, STS-133]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-133
Context triple: [STS-132, nextMission, STS-133]
  • A. STS-133 chosen
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • B. STS-134
    STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
  • C. STS-132
    STS-132 was a 2010 NASA Space Shuttle Atlantis mission to the International Space Station that delivered the Russian Rassvet module and marked Atlantis’s final planned flight.
  • D. STS-131
    STS-131 was a 2010 Space Shuttle Discovery mission to the International Space Station focused on delivering supplies, equipment, and science experiments.
  • E. STS-130
    STS-130 was a 2010 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Tranquility node and the Cupola observatory module.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9070cac81909fa9473fb1c3f1c7 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4d9f6a85481909894c39c8be98d5d completed April 19, 2026, 1:34 p.m.
Created at: April 10, 2026, 10:26 a.m.