Triple

T18077075
Position Surface form Disambiguated ID Type / Status
Subject Homewood E432580 entity
Predicate hasTrail P3625 FINISHED
Object Shades Creek Greenway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shades Creek Greenway | Statement: [Homewood, hasTrail, Shades Creek Greenway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Shades Creek Greenway
Context triple: [Homewood, hasTrail, Shades Creek Greenway]
  • A. Salado Creek Greenway
    Salado Creek Greenway is a linear greenway and trail system in San Antonio that follows Salado Creek, offering recreational paths, natural habitats, and park connections throughout the city.
  • B. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • C. Clear Creek Greenway
    Clear Creek Greenway is a protected natural and recreational corridor in Shasta County, California, featuring trails, riparian habitat, and public access along Clear Creek.
  • D. Mingo Creek Greenway
    Mingo Creek Greenway is a multi-use recreational trail in Knightdale, North Carolina, offering walking, running, and biking paths along Mingo Creek and connecting to the regional greenway network.
  • E. Fanno Creek Greenway
    Fanno Creek Greenway is a popular multi-use trail and natural corridor in the Portland, Oregon metropolitan area, offering recreational paths, wildlife habitat, and green space along Fanno Creek.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Shades Creek Greenway
Target entity description: Shades Creek Greenway is a multi-use recreational trail and greenway along Shades Creek in Homewood, Alabama, popular for walking, running, and cycling.
  • A. Salado Creek Greenway
    Salado Creek Greenway is a linear greenway and trail system in San Antonio that follows Salado Creek, offering recreational paths, natural habitats, and park connections throughout the city.
  • B. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • C. Clear Creek Greenway
    Clear Creek Greenway is a protected natural and recreational corridor in Shasta County, California, featuring trails, riparian habitat, and public access along Clear Creek.
  • D. Mingo Creek Greenway
    Mingo Creek Greenway is a multi-use recreational trail in Knightdale, North Carolina, offering walking, running, and biking paths along Mingo Creek and connecting to the regional greenway network.
  • E. Fanno Creek Greenway
    Fanno Creek Greenway is a popular multi-use trail and natural corridor in the Portland, Oregon metropolitan area, offering recreational paths, wildlife habitat, and green space along Fanno Creek.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9070cac81909fa9473fb1c3f1c7 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4d9f5d10481908b09af0b44d3db4f completed April 19, 2026, 1:34 p.m.
Created at: April 10, 2026, 10:26 a.m.