Triple

T18074458
Position Surface form Disambiguated ID Type / Status
Subject Preveza–Aktion underwater tunnel E432517 entity
Predicate instanceOf P0 FINISHED
Object submerged tunnel C10278 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: submerged tunnel
Context triple: [Preveza–Aktion underwater tunnel, instanceOf, submerged tunnel]
  • A. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • B. transportation tunnel chosen
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • C. submarine channel
    A submarine channel is an underwater valley-like feature on the seafloor formed by sediment-laden currents that transport and deposit sediments across continental margins and deep ocean basins.
  • D. road tunnel
    A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
  • E. water supply tunnel
    A water supply tunnel is an underground passage constructed to convey water from its source to treatment facilities, storage reservoirs, or distribution networks, often over long distances and through challenging terrain.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9070cac81909fa9473fb1c3f1c7 completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:26 a.m.