Triple
T18069961
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Carlos Hugo, Duke of Parma |
E432398
|
entity |
| Predicate | startTime (marriage to Princess Irene of the Netherlands) |
P129696
|
FINISHED |
| Object | 1964 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1964 | Statement: [Carlos Hugo, Duke of Parma, startTime (marriage to Princess Irene of the Netherlands), 1964]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: startTime (marriage to Princess Irene of the Netherlands) Context triple: [Carlos Hugo, Duke of Parma, startTime (marriage to Princess Irene of the Netherlands), 1964]
-
A.
startTime (marriage to John Spencer-Churchill)
Indicates the date and time at which the marriage to John Spencer-Churchill began.
-
B.
startTime (marriage to Stavros Niarchos)
Indicates the date and time when the marriage to Stavros Niarchos began.
-
C.
marriageOfWilliamOfOrangeOccurredIn
Indicates that the marriage of William of Orange took place in the specified location or context.
-
D.
startTime (spouse Edward VIII)
Indicates the point in time when the subject’s spousal relationship with Edward VIII began.
-
E.
endTime (marriage to Joséphine)
Indicates the point in time at which the marriage to Joséphine legally or formally ended.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9070cac81909fa9473fb1c3f1c7 |
completed | April 10, 2026, 8:47 a.m. |
| NER | Named-entity recognition | batch_69e4cced29fc81908e87b4f1990fa0d8 |
completed | April 19, 2026, 12:39 p.m. |
| PD | Predicate disambiguation | batch_69e3f90c652481908133a73106d78919 |
completed | April 18, 2026, 9:35 p.m. |
| PDg | Predicate description generation | batch_69e42d8eefa88190a700c7c1b4213e46 |
completed | April 19, 2026, 1:19 a.m. |
Created at: April 10, 2026, 10:26 a.m.