Triple

T18068164
Position Surface form Disambiguated ID Type / Status
Subject Huntly E432346 entity
Predicate hasLandmark P105 FINISHED
Object Huntly Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Huntly Power Station | Statement: [Huntly, hasLandmark, Huntly Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Huntly Power Station
Context triple: [Huntly, hasLandmark, Huntly Power Station]
  • A. Aviemore Power Station
    Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
  • B. Pitlochry Power Station
    Pitlochry Power Station is a hydroelectric generating facility in the Scottish Highlands, known for its role in renewable energy production and its proximity to the popular Pitlochry Dam and fish ladder.
  • C. Clunie power station
    Clunie power station is a hydroelectric power facility in Scotland that harnesses the flow of the River Tummel to generate electricity.
  • D. Rannoch power station
    Rannoch power station is a hydroelectric power facility in the Scottish Highlands that forms part of the Tummel Valley hydroelectric scheme operated by SSE.
  • E. Peterhead Power Station
    Peterhead Power Station is a major gas-fired power plant in Aberdeenshire, Scotland, known for its role in electricity generation and as a site for developing low-carbon and carbon capture technologies.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Huntly Power Station
Target entity description: Huntly Power Station is New Zealand’s largest thermal power station, a major coal- and gas-fired electricity generation facility located near the town of Huntly in the Waikato region.
  • A. Aviemore Power Station
    Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
  • B. Pitlochry Power Station
    Pitlochry Power Station is a hydroelectric generating facility in the Scottish Highlands, known for its role in renewable energy production and its proximity to the popular Pitlochry Dam and fish ladder.
  • C. Clunie power station
    Clunie power station is a hydroelectric power facility in Scotland that harnesses the flow of the River Tummel to generate electricity.
  • D. Rannoch power station
    Rannoch power station is a hydroelectric power facility in the Scottish Highlands that forms part of the Tummel Valley hydroelectric scheme operated by SSE.
  • E. Peterhead Power Station
    Peterhead Power Station is a major gas-fired power plant in Aberdeenshire, Scotland, known for its role in electricity generation and as a site for developing low-carbon and carbon capture technologies.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9070cac81909fa9473fb1c3f1c7 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4cceb020081909329492591e7b1f2 completed April 19, 2026, 12:39 p.m.
Created at: April 10, 2026, 10:26 a.m.