Triple
T18067223
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | D8 Adriatic Highway |
E432323
|
entity |
| Predicate | maintainedBy |
P86
|
FINISHED |
| Object | Hrvatske ceste |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hrvatske ceste | Statement: [D8 Adriatic Highway, maintainedBy, Hrvatske ceste]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hrvatske ceste Context triple: [D8 Adriatic Highway, maintainedBy, Hrvatske ceste]
-
A.
Croatian A6 motorway
The Croatian A6 motorway is a major highway in Croatia that forms a key part of the route connecting the capital Zagreb with the coastal city of Rijeka, traversing the mountainous Gorski Kotar region.
-
B.
Belgrade–Zagreb highway
The Belgrade–Zagreb highway is a major motorway in the Balkans that connects the capitals of Serbia and Croatia as part of the key transport corridor between Central and Southeast Europe.
-
C.
Zagreb–Sisak corridor
The Zagreb–Sisak corridor is a key transportation route in central Croatia that links the capital city of Zagreb with the industrial city of Sisak.
-
D.
D8 Adriatic Highway
The D8 Adriatic Highway is a major coastal road in Croatia that runs along the Adriatic Sea, connecting numerous coastal towns and tourist destinations.
-
E.
Belgrade–Niš highway
The Belgrade–Niš highway is a major Serbian motorway that connects the capital Belgrade with the city of Niš, forming a key segment of the country’s primary north–south transport corridor.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Hrvatske ceste Target entity description: Hrvatske ceste is the state-owned company responsible for managing and maintaining Croatia’s national road network.
-
A.
Croatian A6 motorway
The Croatian A6 motorway is a major highway in Croatia that forms a key part of the route connecting the capital Zagreb with the coastal city of Rijeka, traversing the mountainous Gorski Kotar region.
-
B.
Belgrade–Zagreb highway
The Belgrade–Zagreb highway is a major motorway in the Balkans that connects the capitals of Serbia and Croatia as part of the key transport corridor between Central and Southeast Europe.
-
C.
Zagreb–Sisak corridor
The Zagreb–Sisak corridor is a key transportation route in central Croatia that links the capital city of Zagreb with the industrial city of Sisak.
-
D.
D8 Adriatic Highway
The D8 Adriatic Highway is a major coastal road in Croatia that runs along the Adriatic Sea, connecting numerous coastal towns and tourist destinations.
-
E.
Belgrade–Niš highway
The Belgrade–Niš highway is a major Serbian motorway that connects the capital Belgrade with the city of Niš, forming a key segment of the country’s primary north–south transport corridor.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9070cac81909fa9473fb1c3f1c7 |
completed | April 10, 2026, 8:47 a.m. |
| NER | Named-entity recognition | batch_69e4cceb020081909329492591e7b1f2 |
completed | April 19, 2026, 12:39 p.m. |
Created at: April 10, 2026, 10:26 a.m.