Triple

T18065770
Position Surface form Disambiguated ID Type / Status
Subject San Francisco Municipal Railway substations E432288 entity
Predicate instanceOf P0 FINISHED
Object electrical substation network C7916 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electrical substation network
Context triple: [San Francisco Municipal Railway substations, instanceOf, electrical substation network]
  • A. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • B. power system chosen
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • C. national grid system
    A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
  • D. electricity interconnector
    An electricity interconnector is a high-capacity transmission link that connects the power grids of different regions or countries, enabling cross-border exchange of electrical energy.
  • E. substation automation standard
    A substation automation standard defines the protocols, architectures, and requirements that enable interoperable, secure, and automated monitoring, control, and protection of electrical substations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9070cac81909fa9473fb1c3f1c7 completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:26 a.m.