Triple

T18055487
Position Surface form Disambiguated ID Type / Status
Subject A House for Essex E432027 entity
Predicate instanceOf P0 FINISHED
Object holiday home C6379 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: holiday home
Context triple: [A House for Essex, instanceOf, holiday home]
  • A. summer residence chosen
    A summer residence is a seasonal dwelling used primarily during the warmer months for leisure, relaxation, and temporary living away from one’s primary home.
  • B. winter residence
    A winter residence is a dwelling specifically used or designed for living in during the winter season, often featuring enhanced insulation, heating, and amenities suited to cold weather conditions.
  • C. stone house
    A stone house is a residential building constructed primarily from natural or cut stone, valued for its durability, thermal mass, and traditional aesthetic.
  • D. beach house
    A beach house is a residential structure located near the shoreline, designed to provide comfortable living spaces that maximize views, natural light, and access to coastal recreation while withstanding the unique environmental conditions of a marine setting.
  • E. holiday weekend
    A holiday weekend is an extended weekend that includes at least one public or religious holiday, often giving people extra time off for travel, leisure, or special events.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b906482481908183315b9ecf9994 completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:26 a.m.