Triple

T18054742
Position Surface form Disambiguated ID Type / Status
Subject Agios Dimitrios Power Station E432007 entity
Predicate operator P179 FINISHED
Object Public Power Corporation NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Public Power Corporation | Statement: [Agios Dimitrios Power Station, operator, Public Power Corporation]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Public Power Corporation
Context triple: [Agios Dimitrios Power Station, operator, Public Power Corporation]
  • A. Public Power Corporation S.A. chosen
    Public Power Corporation S.A. is Greece’s largest electric power company, responsible for electricity generation, distribution, and supply across the country.
  • B. National Power Corporation
    The National Power Corporation is a Philippine government-owned corporation responsible for power generation and electrification, particularly in missionary and off-grid areas.
  • C. Puerto Rico Electric Power Authority
    The Puerto Rico Electric Power Authority is the public corporation responsible for generating, transmitting, and distributing electricity across Puerto Rico.
  • D. North South Power Company Limited
    North South Power Company Limited is a Nigerian private power generation company best known for managing and operating major hydroelectric assets such as the Shiroro Hydroelectric Power Station.
  • E. National Grid Corporation of the Philippines (service area dependent)
    The National Grid Corporation of the Philippines is the private concessionaire responsible for operating, maintaining, and developing the country’s high-voltage power transmission network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b906482481908183315b9ecf9994 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4c101dfb081908dc66f4b4967d8c7 completed April 19, 2026, 11:48 a.m.
Created at: April 10, 2026, 10:26 a.m.